Associated gas utilization

Associated gas utilization

Turnkey construction of two gas treatment facilities in Atyrau region, Republic of Kazakhstan. One unit upon the project “Extension of the gas treatment and transportation system in oilfields of East Makat of the Oil and Gas Production Department “DossorMunaiGas” compresses the produced gas and brings it into a state complying with the requirements of GOST 5542-87. The gas treatment unit in Vostochniy oilfield is designed for processing of associated petroleum gas in a volume of 40 mln nm3 per year.

The other unit upon the project “Extension of gas treatment and transportation system in oilfields of S.Balgimbayev of Oil and Gas Production Department “ZhaikMunaiGas” is designed for processing of associated petroleum gas in a volume of 20 mln nm3 per year.